Scheduling Classic Reports
Using the Report Scheduling page, you can schedule a report to run at the same time on specified days. This way, you can schedule a report to run nightly, weekly, monthly, and so on.
note
Only a user with the Super Administrator role or the user who originally started running the report can cancel a report while it is in progress, whether the report is run manually or by the FlexNet Manager for Engineering Applications scheduler.
To run a report at scheduled times:
- From the
Reporting
tab, under Classic Reporting , click Report Configurations . This displays the Report Configurations page. - Click the Schedule button to the right of the report configuration for which you want to schedule a run. This opens the Report Scheduling page.
- In the Run Report section, click one of the radio buttons:
- Not Scheduled—This report is not scheduled to run.
- These days at (hh:mm)—Specify a time (using a 24-hour clock) and select the days of the week on which you want the report to run.
- These months on day (number of day in a month) at (hh:mm)—Select the day, specify a time (using a 24-hour clock), and select the months on which you want the report to run.
- Click Save .
After the report runs, the report output is available in the Report Inbox .