Skip to main content

Scheduling Classic Reports

Using the Report Scheduling page, you can schedule a report to run at the same time on specified days. This way, you can schedule a report to run nightly, weekly, monthly, and so on.

note

Only a user with the Super Administrator role or the user who originally started running the report can cancel a report while it is in progress, whether the report is run manually or by the FlexNet Manager for Engineering Applications scheduler.

To run a report at scheduled times:

  1. From the Reportingtab, under Classic Reporting , click Report Configurations . This displays the Report Configurations page.
  2. Click the Schedule button to the right of the report configuration for which you want to schedule a run. This opens the Report Scheduling page.
  3. In the Run Report section, click one of the radio buttons:
    • Not Scheduled—This report is not scheduled to run.
    • These days at (hh:mm)—Specify a time (using a 24-hour clock) and select the days of the week on which you want the report to run.
    • These months on day (number of day in a month) at (hh:mm)—Select the day, specify a time (using a 24-hour clock), and select the months on which you want the report to run.
  4. Click Save .

After the report runs, the report output is available in the Report Inbox .

See Also

Reporting on License Usage

Running Classic Reports

Viewing Classic Report Output in the Report Inbox